Template:Motd/2016-03-03 (en)

From Wikimedia Commons, the free media repository
Revision as of 17:36, 20 January 2016 by Yann (talk | contribs) (Created page with '{{Motd description|1=Vogtle Unit 3 Condenser B time-lapse video. The Condenser B Lower Shell was placed into the Vogtle Unit 3 turbine island on March 26, 2014....')
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Vogtle Unit 3 Condenser B time-lapse video. The Condenser B Lower Shell was placed into the Vogtle Unit 3 turbine island on March 26, 2014. Weighing approximately 1.4 million pounds (717 tons), the component was set using the heavy lift derrick, Georgia, USA.

This is the English translation of the Media of the day description page from 3 March 2016.

Descriptions in other languages: